154HC Mast Section Installation and self-examination of Tower ceiling lifting and turning
Standard requirements for self-inspection of Tower lifting and rotation:
1. A balance valve or hydraulic lock shall be provided and connected to the cylinder with a hard tube.
2. When there is no central collector ring, a rotary limit should be set. The rotating part should be free to rotate in the non-working state. No stopper should be set up.
154HC Mast Section 154HC mast section the specification can suitable this situaton no problem
সর্বশেষ দাম পান? আমরা যত তাড়াতাড়ি সম্ভব প্রতিক্রিয়া জানাব (12 ঘন্টার মধ্যে)
পণ্য
বৈশিষ্ট্যযুক্ত পণ্য
যোগাযোগের ঠিকানা