L68B2 Mast Section Problems noted in the construction of Tower hoist

25-10-2019

When using a tower crane for construction, we need to pay attention to many safety problems.
1. Product nameplate and property rights record Mark complete.
2. The distance between the tail of the tower and the buildings and construction facilities is not less than 0.6 meters.

L68B2 Mast Section L68B2 mast section good at  in this field

3. The distance between the horizontal and vertical directions of the two towers is not less than 2 meters.
4. The distance from the transmission line conforms to the provisions of the existing national standard "Safety Regulations for Tower Hang".
The technical data of the tower crane, the logo and environmental data of the tower crane are complete, and the tower crane self-inspection records are complete and valid. After the tower crane supervision and inspection report, it can pass the comprehensive acceptance of the tower crane.

L68B2 Mast Section L68B2 mast section good at  in this field

 