L68B2 Mast Section Tower crane installation process

24-10-2019

1. Preparations before installation



A. understand the site layout and soil conditions, and clean up the surrounding obstacles.


L68B2 Mast Section L68B2 mast section good at  in this field . 


B. determine the parking position of the crane according to the layout of the building.


C. prepare for lifting mechanical sleepers, wooden wedges and sufficient lead wires, sleepers, lifting steel wire ropes, rope buckles and other common tools.


L68B2 Mast Section L68B2 mast section good at  in this field . 


2. Installation of underframe



L68B2 Mast Section L68B2 mast section good at  in this field . 

A. fasten the underframe on the foundation and level it with anchor bolt pressing plate, etc.


L68B2 Mast Section


B. install the standard section. The hoisting standard section is on the underframe (pay attention to the direction of the climbing claw is parallel to the building).



L68B2 Mast Section L68B2 mast section good at  in this field . 

Connect the standard section and the base of the underframe with high-strength bolts (each set of high-strength bolts is one bolt, two washers and two nuts). Lift and connect another standard section to the lower standard section. The pre tightening force of high-strength bolt is 35.5t, and the pre tightening torque is 2000N. M. Measure the perpendicularity of the installed two standard sections to the underframe plane。

L68B2 Mast Section

সর্বশেষ দাম পান? আমরা যত তাড়াতাড়ি সম্ভব প্রতিক্রিয়া জানাব (12 ঘন্টার মধ্যে)

গোপনীয়তা নীতি